Mercado Node 3 - Ground Crew in Action
Posted March 4th, 2005 by mikemee
David and Doug (left to right) were our ground crew for the Node 3 and Node 4 installations. They handled the messy details of routing the cable once it reached the ground and terminating the ground wire and routing the cat-5 into the utility cabinet where was connected to the PoE injector to power the rooftop radio.
David and Doug (left to right) were our ground crew for the Node 3 and Node 4 installations. They handled the messy details of routing the cable once it reached the ground and terminating the ground wire and routing the cat-5 into the utility cabinet where was connected to the PoE injector to power the rooftop radio.
So Cal Free Net.org
Comments
Post new comment